
Guangzhou has received the first test call at its new Nansha Phase IV Terminal (location), which is located along a new basin situated on the north side of the existing facilities. The fully-automated terminal is equipped with nine remote-controlled Ship-to Shore gantry cranes operated along a 1,400 metre (4 berths) quay line.